04. Why was the connecting road, Callender Drive not built before closing Simms Street?

The dirt required to build the connecting road, Callender Drive, comes from the existing road.

Show All Answers

1. 01. Why will Simms Street be closed until fall 2024?
2. 02. Will there be bike lanes on Simms Street?
3. 03. Does the existing Simms Street need to be closed at the same time the new alignment is being built?
4. 04. Why was the connecting road, Callender Drive not built before closing Simms Street?
5. 05. Will bike lanes be provided on the new road, Callender Drive?