UPDATE – Grizzly Way to be closed over-night tonight, 10/29/2018 due to damaged utilities.
Upcoming Construction Project – Grizzly Way Road Culvert
A day time road closure of Grizzly Way between Gray Fox Dr. and Red Fox Dr. is scheduled to take place between 7:00am and 4:00pm starting Monday, October 29, 2018 through Wednesday, October 31, 2018.
The day-time closure is necessary to replace a failing culvert at the site.
Variable message boards are in place and active. A detour route is planned along Red Fox Dr. and Gray Fox Dr. Please refer to the attached traffic control map for additional details. If you would like any further details, please call 303-271-5290
Don Kennedy
Construction Project Manager
o 303.271.5218 f 303.271.5222 w jeffco.us o 303.886.8743 m