Project Scope:
The McIntyre Street Roadway Improvements Project, fourth and final phase, will reconstruct McIntyre Street between W. 52nd Avenue and W. 56th Place. Roadway improvements will include:
  • Link to see McIntyre Street (W. 52nd Drive to W. 56th Place) on a mapWidening of the road to four 11-foot travel lanes with raised center medians
  • Storm drainage improvements
  • 4-foot bike lanes
  • 8-foot sidewalks
  • Reconstruction of the traffic signal at W. 54th Avenue. New traffic signal poles will be installed on the east side of the intersection.
  • Relocation of North Table Mountain Water and Sanitation District water main

See McIntyre Street, W. 52nd Avenue to W. 56th Place For Construction Plans (PDF) (106.8 MB)

Phase IV of this project has been awarded to Edge Contracting, Inc. in the amount of $3,029,418.00.

Project Update (as of October 29, 2020):
The general contractor, Edge Contracting, started construction on McIntyre Street Improvements from W. 52nd Avenue to W. 56th Place.

Starting in November, all traffic will be moved to the two southbound lanes of McIntyre Street. The northbound traffic lane from W. 52nd Avenue to W. 56th Place will be closed. This configuration will be in place from November through approximately the end of December.

See Edge Contracting Construction Notice

During this time, please be prepared for longer commute times, increased traffic congestion at peak times and slower speed limits along the affected stretch of McIntyre Street.

For more information, please call the project hotline (720) 295-2227 or send an email.