Blog module icon

Archives Blog

May 02

[ARCHIVED] Bergen Parkway at Sugarbush Drive Intersection Pedestrian Improvements, Evergreen CO 80439

The original item was published from January 21, 2022 12:45 PM to May 9, 2022 9:52 AM

Project Location:

Improvements will be made at the intersection of Bergen Parkway and Sugarbush Drive in Evergreen.

Link to Bergen Parkway and Sugarbush Drive project site map.

Project Background:

Bergen Parkway at Sugarbush Drive is a main intersection in north Evergreen with connections to local businesses. The existing islands have cracked and broken concrete, and the pedestrian ramps are not up to current standards.

See the Bergen Parkway and Sugarbush Drive Island Extension Layout (PDF).

Project Scope:

The project will replace the existing concrete islands and corner ramps at the intersection. Americans with Disabilities Act (ADA) compliant ramps and crosswalks will be installed and the islands will be larger, creating a safer pedestrian crossing at the intersection. Asphalt for the entire intersection will be replaced, repaved, and restriped. The traffic configuration with the four-way stop will not change.

Project Schedule:

Design for this project is underway. Construction will occur in Summer 2022 pending Colorado Department of Transportation grant approval.

For Questions:

Please contact Transportation and Engineering online or call 303-271-8495 with questions. For more information, please see the Evergreen Local Improvement District webpage.