Re-Roofing

The Re-Roofing Process

All inspection requests are for the "Next Day Only"

Two Inspections Are Required

  • A mid-roof (when more than 10%, but less than 25% of the roof is complete).
  • A final roof inspection (when the roof is complete).
  • We do not accept pictures.
  • The building permit card must be posted where it is accessible and visible from the street.
  • Access to the roof must be provided to areas taller than one story.

Scheduling Inspections

  • When requesting an inspection by phone, the request must be made by 5:00 pm one business day prior to the requested inspection date. All requests made using the online system are for the next day only. Please do not use the comment section to put a different date. If you would like to schedule a specific date please contact the office at 303-271-8260 Monday thru Thursday.
  • An inspection requests may be made up to 6 a.m. for the same day using the online system.

When the roof has passed the final inspection, a green sticker with the inspector's signature will be affixed to the permit card. This will provide you with a permanent record of the inspections.

Resources